Total construction area: 8.250 m² (Gross). The factory complex has the capacity of producing 600 tons of flour on a daily basis. The steel construction factory consists of cleaning, milling, silo and packing departments, and its flooring system is designed compositely and it is built as a 6-storey steel building.